Skip to content
Technical standards · orphaned systems · safety

Our 4-Step Solar Panel Detach & Reset Technical Process

Enphase, SolarEdge, Tesla, SMA — mapped before detach, recommissioned and monitoring-verified after reset.

STEP 01

Pre-Detach Diagnostics, Production Verification & String/Microinverter Mapping

We record production, string mapping, voltage and inverter diagnostics for Enphase, SolarEdge, Tesla and SMA equipment, with timestamped photos. Existing faults are documented before work starts so they are not mistaken for damage caused by detachment.

STEP 02

Safe Mechanical Detach, Electrical Disconnect & Protected Ground Storage

Electrical disconnect is performed by or legally supervised under TDLR-licensed electrical personnel where required by Texas law. Panels and racking are carefully removed, labeled and secured in protected on-site ground storage while your roofing contractor completes the roof. Leased/PPA systems require written servicer authorization before detachment.

STEP 03

Roof Penetration Weatherproofing & New Flashed Mounts

Every reset uses new manufacturer-compatible flashed mounting hardware and appropriate roof-penetration weatherproofing. We never reuse old compromised roof flashings after tear-off, and coordinate mounting details with your roofing contractor.

STEP 04

Precision Reinstallation, Recommissioning & Photo Closeout

We reinstall the array, complete applicable electrical grounding and recommissioning under Texas licensing requirements, verify monitoring and production, and provide timestamped photo closeout. Manufacturer-authorized hardware swaps and optional perimeter squirrel/critter mesh can be coordinated during reset.

Optional add-ons

While the array is off the roof.

Confirmed in your written scope before work begins.

Perimeter Critter Guard / Squirrel Mesh

Installed during reset around the array perimeter to keep squirrels and birds from nesting and chewing wiring.

Manufacturer Warranty Hardware Swaps

For orphaned systems, we perform the swap labor for manufacturer-approved replacement hardware. Hardware warranties from manufacturers such as Enphase, SolarEdge, Tesla, and Maxeon are generally held with the manufacturer, not the installer, and may remain valid subject to each manufacturer’s terms, registration, and claim approval. We do not guarantee warranty approval.

Texas compliance. Tex. Occ. Code Ch. 1305: electrical disconnect, grounding, and recommissioning are performed by or legally supervised under TDLR-licensed electrical personnel where required by Texas law.